俄罗斯xxxx性全过程_波多野结衣在线中文字幕s级 _国产精品嫩草影院久久_伊人大香人妻在线播放_精品动漫福利h视频在线观看_久久久国产一区二区三区四区小说_东京热一本无码av_欧美人与动牲交欧美精品_老司机午夜福利人ae85_中文乱码 中文字幕。一区二区

phone/wechat/what's app: +86-18653810085

Email: hongyuanmakela@163.com

Taian Hongyuan Geosynthetics Co., Ltd.
Tel:18653810085

Technical Services Current Position:Home > Technical Services

Construction requirements of geosynthetic clay liner(GCL)

Release time:2020-4-7    This article is read :4366 Times

geosynthetic clay liner(GCL)

Construction requirements of geosynthetic clay liner(GCL)

1. The base layer should be checked before the construction of the geosynthetic clay liner(GCL). The base layer should be tamped and flat, without pits and water, and without pebble tree roots and other sharp objects.

2. During the handling and construction process of the geosynthetic clay liner(GCL), it is necessary to avoid vibration and impact as much as possible to avoid the large curvature of the blanket body. Taian Hongyuan recommends that it be in place at one time.

3. After the installation and acceptance of the GCL, the backfill work should be carried out as soon as possible. If it is used in conjunction with HDPE geomembrane, the geomembrane should be pavement welded in time to prevent it from being wet or broken by rain.

Construction requirements of geosynthetic clay liner(GCL)
Previous:Product technology of geosynthetic clay liner(GCL)next:Construction notes of GCL

Contact Us:

WeChat public account

Taian Hongyuan Geosynthetics Co., Ltd.

Phone / Wechat / What's app:+86-18653810085

Telephone / Fax: + 86-538-6598877

Email:  hongyuanmakela@163.com

Website: www.lydkkg.com.cn

Address: Jinghua Industrial Zone, NO. 88 Leigushi Street, Taishan Industrial Park, Taian City, Shandong Province, China

Copyright? Taian Hongyuan Geosynthetics Co., Ltd.            Lugong Network Security No. 37090202000491            Lu ICP No. 16042524-1           公示信息